(ANM) Feeringbury Farm

(ANM) Feeringbury Farm, Padero Solaer Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 15 MW, grid supply point Braintree.

Customer
Padero Solaer Limited
Status
Accepted to connect
Capacity
15 MW
Technology
Solar (Photovoltaic)
Flexible connection
Yes (capacity not firm)
Grid supply point
Braintree
Bulk supply point
Braintree Local 33kV
Voltage
33 kV
Date accepted
10 Jul 2022
Target energisation
31 Oct 2032
In a connection queue
Yes
Row last updated by the DNO
12 Jul 2024
Licence area
EPN
Address
Coggeshall Road, Colchester
Postcode
CO16 1RR

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.