Cut Throat Lane

Cut Throat Lane, Foundation Property & Capital, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 10 MW, grid supply point Braintree.

Customer
Foundation Property & Capital
Status
Connected
Capacity
10 MW
Maximum import capacity
0.2 MW
Technology
Gas (Gas turbine (OCGT))
Flexible connection
No
Grid supply point
Braintree
Bulk supply point
Braintree Local 33kV
Point of connection
Witham Primary 11kV
Voltage
11 kV
Date connected
16 Feb 2023
In a connection queue
No
Row last updated by the DNO
14 Aug 2023
Licence area
EPN
Address
Great Braxted
Postcode
CM8 2GD
Export MPAN
1050002481400
Import MPAN
1050002514456

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.