(ANM) Land At Cressing Farm
(ANM) Land At Cressing Farm, Eden CF Solar Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 13.8 MW, grid supply point Braintree.
- Customer
- Eden CF Solar Limited
- Status
- Accepted to connect
- Capacity
- 13.8 MW
- Technology
- Solar (Photovoltaic)
- Flexible connection
- Yes (capacity not firm)
- Grid supply point
- Braintree
- Bulk supply point
- Braintree Local 33kV
- Voltage
- 33 kV
- Date accepted
- 1 Oct 2021
- Target energisation
- 31 Dec 2024
- In a connection queue
- Yes
- Row last updated by the DNO
- 12 Jul 2024
- Licence area
- EPN
- Address
- Braintree
- Postcode
- CM77 8PD
A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.