(ANM) Land At Cressing Farm

(ANM) Land At Cressing Farm, Eden CF Solar Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 13.8 MW, grid supply point Braintree.

Customer
Eden CF Solar Limited
Status
Accepted to connect
Capacity
13.8 MW
Technology
Solar (Photovoltaic)
Flexible connection
Yes (capacity not firm)
Grid supply point
Braintree
Bulk supply point
Braintree Local 33kV
Voltage
33 kV
Date accepted
1 Oct 2021
Target energisation
31 Dec 2024
In a connection queue
Yes
Row last updated by the DNO
12 Jul 2024
Licence area
EPN
Address
Braintree
Postcode
CM77 8PD

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.