Grid GuardianOpen the evidence in the app

Land To The West Of The A131

Land To The West Of The A131, Belectric Solar Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 10 MW, grid supply point Braintree.

Customer
Belectric Solar Limited
Status
Connected
Capacity
10 MW
Maximum import capacity
10 MW
Technology
Storage (Storage - Electrochemical (Batteries))
Flexible connection
No
Grid supply point
Braintree
Bulk supply point
Braintree Local 33kV
Voltage
33 kV
Date connected
4 Nov 2020
In a connection queue
No
Row last updated by the DNO
14 Jul 2021
Licence area
EPN
Address
Braintree
Postcode
CM77 7WW
Export MPAN
1050002055549/1050002055567
Import MPAN
1050002055530/1050002055558

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.

Source