11 connections of 1 MW and over at Beddington 132kV in UK Power Networks's register of 14 Oct 2026: 12 MW accepted to connect and 105.5 MW connected. Each row's own figure, added across rows; contracted volume, not headroom.
| Site | Customer | Technology | MW | Status | Target energisation |
|---|---|---|---|---|---|
| Rolls Royce Power | Croydon Energy | Gas | 58 | Connected | |
| Beddington Lane ERF | Viridor Waste Manatement Limited | Energy from waste | 27 | Connected | |
| Tillingdown Farm | Ylem BESS (South) Limited | Storage | 12 | Accepted to connect | 10 Jan 2026 |
| Viridor Waste Management, Beddington Farm Landfill Site | Viridor Waste Management Limited | Bioenergy | 7 | Connected | |
| Cheam WTW 213936 | Sutton and East Surrey Water plc | Fossil - Oil | 4.42 | Connected | |
| Beddington Lane ERF | Viridor South London Limited | Energy from waste | 2 | Connected | |
| 15 Cotswold Rd | Royal Marsden Hospital | Fossil - Oil | 2 | Connected | |
| Beddington Sewage Works | Thames Water Utilities Limited | Gas | 2 | Connected | |
| Biggin Hill Airport (Kite Shed) | Zestec Asset Management Limited | Solar | 1.1 | Connected | |
| Kenley WTW 21249 | Sutton and East Surrey Water PLC | Fossil - Oil | 1.02 | Connected | |
| Croydon University Hospital | Cogenco Limited | Gas | 1 | Connected |