Grid GuardianOpen the evidence in the app

Cheam WTW 213936

Cheam WTW 213936, Sutton and East Surrey Water plc, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 4.42 MW, grid supply point Beddington 132kV.

Customer
Sutton and East Surrey Water plc
Status
Connected
Capacity
4.42 MW
Technology
Fossil - Oil (Engine (combustion / reciprocating))
Flexible connection
No
Grid supply point
Beddington 132kV
Bulk supply point
Sutton Grid 33kV
Point of connection
Sutton B 11kV
Voltage
11 kV
Date connected
22 Mar 2011
In a connection queue
No
Row last updated by the DNO
14 Jul 2021
Licence area
South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
Address
Shearwater Road, Cheam
Postcode
SM1 2EW
Export MPAN
1900090724005

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.

Source