Beddington Lane ERF

Beddington Lane ERF, Viridor South London Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 2 MW, grid supply point Beddington 132kV.

Customer
Viridor South London Limited
Status
Connected
Capacity
2 MW
Technology
Energy from waste (Steam turbine (thermal power plant))
Flexible connection
No
Grid supply point
Beddington 132kV
Bulk supply point
Croydon B 33kV
Voltage
33 kV
Date connected
9 Feb 2017
In a connection queue
No
Row last updated by the DNO
12 Dec 2025
Licence area
South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
Address
Beddington Lane, Croydon
Postcode
CR0 4TT

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.