Tillingdown Farm

Tillingdown Farm, Ylem BESS (South) Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 12 MW, grid supply point Beddington 132kV.

Customer
Ylem BESS (South) Limited
Status
Accepted to connect
Capacity
12 MW
Technology
Storage (Storage - Electrochemical (Batteries))
Flexible connection
No
Grid supply point
Beddington 132kV
Bulk supply point
Purley Grid 33kV
Voltage
33 kV
Date accepted
20 Apr 2022
Target energisation
10 Jan 2026
In a connection queue
Yes
Row last updated by the DNO
14 Jun 2024
Licence area
South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
Address
Tillingdown Lane, Caterham
Postcode
CR3 7JA

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.