Grid GuardianOpen the evidence in the app

Viridor Waste Management, Beddington Farm Landfill Site

Viridor Waste Management, Beddington Farm Landfill Site, Viridor Waste Management Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 7 MW, grid supply point Beddington 132kV.

Customer
Viridor Waste Management Limited
Status
Connected
Capacity
7 MW
Technology
Bioenergy (Gas turbine (OCGT))
Flexible connection
No
Grid supply point
Beddington 132kV
Point of connection
Beddington 11kV
Voltage
11 kV
Date connected
11 Jan 2006
In a connection queue
No
Row last updated by the DNO
15 Jan 2021
Licence area
South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
Address
Beddington Farm Landfill Site, Sutton
Postcode
CR0 4XB
Export MPAN
1900061301215

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.

Source