Viridor Waste Management, Beddington Farm Landfill Site
Viridor Waste Management, Beddington Farm Landfill Site, Viridor Waste Management Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 7 MW, grid supply point Beddington 132kV.
- Customer
- Viridor Waste Management Limited
- Status
- Connected
- Capacity
- 7 MW
- Technology
- Bioenergy (Gas turbine (OCGT))
- Flexible connection
- No
- Grid supply point
- Beddington 132kV
- Point of connection
- Beddington 11kV
- Voltage
- 11 kV
- Date connected
- 11 Jan 2006
- In a connection queue
- No
- Row last updated by the DNO
- 15 Jan 2021
- Licence area
- South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
- Address
- Beddington Farm Landfill Site, Sutton
- Postcode
- CR0 4XB
- Export MPAN
- 1900061301215
A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.