Beddington Lane ERF
Beddington Lane ERF, Viridor Waste Manatement Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 27 MW, grid supply point Beddington 132kV.
- Customer
- Viridor Waste Manatement Limited
- Status
- Connected
- Capacity
- 27 MW
- Technology
- Energy from waste (Steam turbine (thermal power plant))
- Flexible connection
- No
- Grid supply point
- Beddington 132kV
- Bulk supply point
- Croydon B 33kV
- Voltage
- 33 kV
- Date connected
- 9 Feb 2017
- In a connection queue
- No
- Row last updated by the DNO
- 14 Dec 2022
- Licence area
- South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
- Address
- Beddington Lane, Croydon
- Postcode
- CR0 4TT
- Export MPAN
- 1900091482597
A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.
Source
- UK Power Networks Embedded Capacity Register (1 MW and over), UK Power Networks, publication of 14 Oct 2026. CC BY 4.0, UK Power Networks.