New Cross 132kV grid supply point
7 connections of 1 MW and over at New Cross 132kV in UK Power Networks's register of 14 Oct 2026: 6.6 MW accepted to connect and 37.5 MW connected. Each row's own figure, added across rows; contracted volume, not headroom.
| Site | Customer | Technology | MW | Status | Target energisation |
|---|---|---|---|---|---|
| Kennels Site | Veolia ES SELCHP Limited | Gas | 31.6 | Connected | |
| Guys Hospital | Powerplan Limited | Fossil - Oil | 3.6 | Accepted to connect | |
| Level 3 Communications | Level 3 Communications | Fossil - Oil | 3.2 | Connected | |
| Land Part Of Hermitage Wharf | Disco Powered Limited | Storage | 1.5 | Accepted to connect | |
| Lambeth Pier | Disco Powered Limited | Storage | 1.5 | Accepted to connect | |
| Citibank Data Centre | Citibank Data Centre | Gas | 1.47 | Connected | |
| Waitrose | Waitrose | Fossil - Oil | 1.2 | Connected |
Source
- UK Power Networks Embedded Capacity Register (1 MW and over), UK Power Networks, publication of 14 Oct 2026. CC BY 4.0, UK Power Networks.