Waitrose

Waitrose, Waitrose, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 1.2 MW, grid supply point New Cross 132kV.

Customer
Waitrose
Status
Connected
Capacity
1.2 MW
Technology
Fossil - Oil (Engine (combustion / reciprocating))
Flexible connection
No
Grid supply point
New Cross 132kV
Point of connection
Osborn St B 11kV
Voltage
11 kV
Date connected
15 Apr 1991
In a connection queue
No
Row last updated by the DNO
14 Dec 2021
Licence area
London Power Networks plc
Address
41 Thomas More Street, St Katharines & Wapping
Postcode
E1W 1YY
Export MPAN
1200010155431

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.