Grid GuardianOpen the evidence in the app

Level 3 Communications

Level 3 Communications, Level 3 Communications, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 3.2 MW, grid supply point New Cross 132kV.

Customer
Level 3 Communications
Status
Connected
Capacity
3.2 MW
Technology
Fossil - Oil (Engine (combustion / reciprocating))
Flexible connection
No
Grid supply point
New Cross 132kV
Point of connection
Osborn St B 11kV
Voltage
11 kV
Date connected
25 Jun 2017
In a connection queue
No
Row last updated by the DNO
14 Dec 2021
Licence area
London Power Networks plc
Address
6 Braham Street, Algate
Postcode
E1 8EE
Export MPAN
1200062073850

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.