Citibank Data Centre

Citibank Data Centre, Citibank Data Centre, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 1.47 MW, grid supply point New Cross 132kV.

Customer
Citibank Data Centre
Status
Connected
Capacity
1.47 MW
Technology
Gas (Engine (combustion / reciprocating))
Flexible connection
No
Grid supply point
New Cross 132kV
Point of connection
Deptford Grid 11kV
Voltage
11 kV
Date connected
22 Aug 2015
In a connection queue
No
Row last updated by the DNO
13 Nov 2020
Licence area
London Power Networks plc
Address
66 Molesworth Street, Lewisham / London
Postcode
SE13 7EX
Export MPAN
1200050981431

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.