St Johns Wood grid supply point
7 connections of 1 MW and over at St Johns Wood in UK Power Networks's register of 14 Oct 2026: 2 MW accepted to connect and 18.2 MW connected. Each row's own figure, added across rows; contracted volume, not headroom.
| Site | Customer | Technology | MW | Status | Target energisation |
|---|---|---|---|---|---|
| Imperial College | Imperial College | Gas | 8.75 | Connected | |
| University College London | University College London | Gas | 2.92 | Connected | |
| Pimlico District Heating, The Pump House | Pimlico District Heating, The Pump House | Gas | 2.48 | Connected | |
| 21 Moorfield | Bells Power Solutions | Fossil - Oil | 2 | Accepted to connect | |
| Marks & Spencers | Marks & Spencers | Fossil - Oil | 1.6 | Connected | |
| Mayfair Telephone Exchange | Mayfair Telephone Exchange | Gas | 1.2 | Connected | |
| Royal Marsden Hospital | Royal Marsden Hospital | Gas | 1.2 | Connected |
Source
- UK Power Networks Embedded Capacity Register (1 MW and over), UK Power Networks, publication of 14 Oct 2026. CC BY 4.0, UK Power Networks.