University College London
University College London, University College London, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 2.92 MW, grid supply point St Johns Wood.
- Customer
- University College London
- Status
- Connected
- Capacity
- 2.92 MW
- Technology
- Gas (Steam-gas turbine (CCGT))
- Flexible connection
- No
- Grid supply point
- St Johns Wood
- Point of connection
- Longford St B 11kV
- Voltage
- 0.4 kV
- Date connected
- 1 Oct 2002
- In a connection queue
- No
- Row last updated by the DNO
- 13 Nov 2020
- Licence area
- London Power Networks plc
- Address
- Gower Street, Bloomsbury
- Postcode
- WC1H 0XG
A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.
Source
- UK Power Networks Embedded Capacity Register (1 MW and over), UK Power Networks, publication of 14 Oct 2026. CC BY 4.0, UK Power Networks.