21 Moorfield

21 Moorfield, Bells Power Solutions, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 2 MW, grid supply point St Johns Wood.

Customer
Bells Power Solutions
Status
Accepted to connect
Capacity
2 MW
Technology
Fossil - Oil (Engine (combustion / reciprocating))
Flexible connection
No
Grid supply point
St Johns Wood
Point of connection
Back Hill A 11kV
Voltage
11 kV
Date accepted
2 Jan 2022
In a connection queue
Yes
Row last updated by the DNO
14 Aug 2023
Licence area
London Power Networks plc
Address
City Of London
Postcode
EC2P 2HT

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.