4 connections of 1 MW and over at Chessington in UK Power Networks's register of 14 Oct 2026: 128 MW accepted to connect and 3 MW connected. Each row's own figure, added across rows; contracted volume, not headroom.
| Site | Customer | Technology | MW | Status | Target energisation |
|---|---|---|---|---|---|
| Merton College | Leatherhead BESS Limited C/O EKU Energy | Storage | 98 | Accepted to connect | 31 Mar 2025 |
| Rushett Lane | Enso Green Holdings F Limited | Solar, Storage | 30 | Accepted to connect | 1 Jan 2025 |
| Hogsmill Stw | Thames Water | Fossil - Oil | 2 | Connected | |
| Kingston Hospital | Kingston Hospital NHS Trust | Fossil - Oil | 1 | Connected |
Source
- UK Power Networks Embedded Capacity Register (1 MW and over), UK Power Networks, publication of 14 Oct 2026. CC BY 4.0, UK Power Networks.