Rushett Lane

Rushett Lane, Enso Green Holdings F Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 30 MW, grid supply point Chessington.

Customer
Enso Green Holdings F Limited
Status
Accepted to connect
Capacity
30 MW
Technology
Solar, Storage (Photovoltaic)
Flexible connection
No
Grid supply point
Chessington
Bulk supply point
Chessington Grid
Point of connection
Chessington Grid 33kV
Voltage
33 kV
Date accepted
30 Nov 2022
Target energisation
1 Jan 2025
In a connection queue
Yes
Row last updated by the DNO
12 Jul 2024
Licence area
South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
Address
Epsom
Postcode
KT18 7TR

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.