Hogsmill Stw

Hogsmill Stw, Thames Water, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 2 MW, grid supply point Chessington.

Customer
Thames Water
Status
Connected
Capacity
2 MW
Technology
Fossil - Oil (Engine (combustion / reciprocating))
Flexible connection
No
Grid supply point
Chessington
Bulk supply point
Kingston Grid
Point of connection
Kingston 11kV
Voltage
11 kV
Date connected
31 Oct 2023
In a connection queue
No
Row last updated by the DNO
14 Jun 2024
Licence area
South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
Address
Lower Marsh Lane, Kingston Upon Thames
Postcode
KT1 3BW
Export MPAN
1900090719050/1900091356838/1900091356847

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.

Source