Wryde Croft Wind Farm
Wryde Croft Wind Farm, Wryde Croft Wind Farm Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 26 MW, grid supply point Walpole.
- Customer
- Wryde Croft Wind Farm Limited
- Status
- Connected
- Capacity
- 26 MW
- Technology
- Onshore wind (Onshore wind turbines)
- Flexible connection
- No
- Grid supply point
- Walpole
- Voltage
- 132 kV
- Date connected
- 10 Jan 2016
- In a connection queue
- No
- Row last updated by the DNO
- 14 Feb 2024
- Licence area
- EPN
- Address
- Thorney
- Postcode
- PE12 0NR
- Export MPAN
- 1050000948120
A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.