Grid GuardianOpen the evidence in the app

Woodwalton Lane

Woodwalton Lane, EDF Energy Renewables Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 99.9 MW, grid supply point Eaton Socon.

Customer
EDF Energy Renewables Limited
Status
Accepted to connect
Capacity
99.9 MW
Technology
Solar (Photovoltaic)
Flexible connection
No
Grid supply point
Eaton Socon
Bulk supply point
Huntingdon Grid 132kV
Voltage
132 kV
Date accepted
4 Jul 2025
In a connection queue
Yes
Row last updated by the DNO
15 May 2025
Licence area
EPN
Address
Sawtry
Postcode
PE28 5YJ

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.

Source