Wood Lane

Wood Lane, QC Ubertino Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 49.9 MW, grid supply point Sundon.

Customer
QC Ubertino Limited
Status
Accepted to connect
Capacity
49.9 MW
Technology
Solar, Storage (Photovoltaic)
Flexible connection
No
Grid supply point
Sundon
Voltage
132 kV
Date accepted
11 Jun 2023
Target energisation
31 Oct 2034
In a connection queue
Yes
Row last updated by the DNO
12 Jul 2024
Licence area
EPN
Address
Bedford
Postcode
MK44 3QU

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.