Woburn Road

Woburn Road, Eclipse Power networks Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 12 MW, grid supply point Sundon.

Customer
Eclipse Power networks Limited
Status
Connected
Capacity
12 MW
Maximum import capacity
12 MW
Technology
Storage (Storage - Electrochemical (Batteries))
Flexible connection
No
Grid supply point
Sundon
Bulk supply point
Marston Road Grid 33kV
Voltage
33 kV
Target energisation
22 Dec 2025
Date connected
6 Mar 2025
In a connection queue
Yes
Row last updated by the DNO
12 Jul 2024
Licence area
EPN
Address
Bedford
Postcode
MK43 9AB

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.