Windmill Quarry 522992

Windmill Quarry 522992, NFPA, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 4.5 MW, grid supply point Bolney.

Customer
NFPA
Status
Connected
Capacity
4.5 MW
Technology
Bioenergy (Gas turbine (OCGT))
Flexible connection
No
Grid supply point
Bolney
Bulk supply point
Steyning Grid 33kV
Point of connection
Ashington 11kV
Voltage
11 kV
Date connected
4 Jan 1997
In a connection queue
No
Row last updated by the DNO
15 Jan 2021
Licence area
South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
Address
Hollow Lane, Washington
Postcode
RH20 3BQ
Export MPAN
1900060483490

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.

Source