White Horse Lane Norwich
White Horse Lane Norwich, Island Green Power, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 15 MW, grid supply point Norwich.
- Customer
- Island Green Power
- Status
- Connected
- Capacity
- 15 MW
- Maximum import capacity
- 0.19 MW
- Technology
- Solar (Photovoltaic)
- Flexible connection
- No
- Grid supply point
- Norwich
- Bulk supply point
- Trowse Grid 33kV
- Voltage
- 33 kV
- Date connected
- 22 Aug 2022
- In a connection queue
- No
- Row last updated by the DNO
- 14 Aug 2023
- Licence area
- EPN
- Address
- Norwich
- Postcode
- NR14 8SQ
- Export MPAN
- 1050001541867
A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.
Source
- UK Power Networks Embedded Capacity Register (1 MW and over), UK Power Networks, publication of 14 Oct 2026. CC BY 4.0, UK Power Networks.