Westoning Road

Westoning Road, Green Frog, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 40 MW, grid supply point Sundon.

Customer
Green Frog
Status
Connected
Capacity
40 MW
Maximum import capacity
40 MW
Technology
Storage (Storage - Electrochemical (Batteries))
Flexible connection
No
Grid supply point
Sundon
Voltage
132 kV
Date connected
21 Nov 2019
In a connection queue
No
Row last updated by the DNO
13 Nov 2020
Licence area
EPN
Address
Bedford
Postcode
MK45 5JD
Export MPAN
1050001886087
Import MPAN
1050001886078

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.