Weston Longville PV Farm

Weston Longville PV Farm, Esco NRG Ltd C/o RenEnergy Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 9 MW, grid supply point Norwich.

Customer
Esco NRG Ltd C/o RenEnergy Limited
Status
Connected
Capacity
9 MW
Technology
Solar (Photovoltaic)
Flexible connection
No
Grid supply point
Norwich
Bulk supply point
Sall Grid 33kV
Point of connection
Weston Longville Primary 11kV
Voltage
11 kV
Date connected
13 Feb 2014
In a connection queue
No
Row last updated by the DNO
13 Nov 2020
Licence area
EPN
Address
Weston Longville
Postcode
NR9 5LG
Export MPAN
1050000574221

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.