Westcott Venture Park, Phase 2A and Phase 2B
Westcott Venture Park, Phase 2A and Phase 2B, Shanks Waste Management Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 1.1 MW, grid supply point Sundon.
- Customer
- Shanks Waste Management Limited
- Status
- Connected
- Capacity
- 1.1 MW
- Technology
- Solar (Photovoltaic)
- Flexible connection
- No
- Grid supply point
- Sundon
- Bulk supply point
- Aylesbury East Grid 33kV
- Point of connection
- Waddesdon Primary 11kV
- Voltage
- 11 kV
- Date connected
- 9 Mar 2012
- In a connection queue
- No
- Row last updated by the DNO
- 13 Nov 2020
- Licence area
- EPN
- Address
- Westcott Venture Park, Aylesbury
- Postcode
- HP18 0NX
- Export MPAN
- 1030082301361
A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.
Source
- UK Power Networks Embedded Capacity Register (1 MW and over), UK Power Networks, publication of 14 Oct 2026. CC BY 4.0, UK Power Networks.