Upwell Wind Farm
Upwell Wind Farm, Elawan Energy UK Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 14.4 MW, grid supply point Walpole.
- Customer
- Elawan Energy UK Limited
- Status
- Accepted to connect
- Capacity
- 14.4 MW
- Technology
- Onshore wind (Onshore Wind Turbines)
- Flexible connection
- Yes (capacity not firm)
- Grid supply point
- Walpole
- Bulk supply point
- March
- Voltage
- 33 kV
- Date accepted
- 22 Jun 2026
- In a connection queue
- Yes
- Row last updated by the DNO
- 14 Jul 2026
- Licence area
- EPN
- Address
- Land at Bedlam Cottage, March
- Postcode
- PE15 0DS
A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.
Source
- UK Power Networks Embedded Capacity Register (1 MW and over), UK Power Networks, publication of 14 Oct 2026. CC BY 4.0, UK Power Networks.