The Old Airfield

The Old Airfield, TH Companies, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 5.6 MW, grid supply point Rayleigh.

Customer
TH Companies
Status
Connected
Capacity
5.6 MW
Technology
Solar (Photovoltaic)
Flexible connection
No
Grid supply point
Rayleigh
Bulk supply point
Abberton Grid 33kV
Voltage
33 kV
Date connected
15 Sept 2015
In a connection queue
No
Row last updated by the DNO
13 Nov 2020
Licence area
EPN
Address
Blind Lane, Birch
Postcode
CO5 9XE
Export MPAN
1050000890765

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.