Thanet Energy

Thanet Energy, Thanet Energy Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 30 MW, grid supply point Richborough/Sellindge 132kV.

Customer
Thanet Energy Limited
Status
Connected
Capacity
30 MW
Technology
Gas (Steam-gas turbine (CCGT))
Flexible connection
No
Grid supply point
Richborough/Sellindge 132kV
Voltage
33 kV
Date connected
23 Apr 2009
In a connection queue
No
Row last updated by the DNO
14 Oct 2022
Licence area
South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
Address
Seamark Road, Birchington
Postcode
CT7 0JL
Export MPAN
1998000000024

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.