Tesco Distribution Centre

Tesco Distribution Centre, Tesco PLC, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 1.2 MW, grid supply point Warley.

Customer
Tesco PLC
Status
Connected
Capacity
1.2 MW
Technology
Gas (Steam-gas turbine (CCGT))
Flexible connection
No
Grid supply point
Warley
Bulk supply point
Purfleet Grid 33kV
Point of connection
Purfleet Primary 11kV T1 & T2
Voltage
11 kV
Date connected
11 Sept 2012
In a connection queue
No
Row last updated by the DNO
15 Jan 2021
Licence area
EPN
Address
Rainham
Postcode
RM13 8GJ
Export MPAN
1050000597089

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.