Grid GuardianOpen the evidence in the app

Sycamore Farm

Sycamore Farm, Electricity Solutions Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 18 MW, grid supply point Richborough/Sellindge 132kV.

Customer
Electricity Solutions Limited
Status
Connected
Capacity
18 MW
Technology
Solar (Photovoltaic)
Flexible connection
No
Grid supply point
Richborough/Sellindge 132kV
Bulk supply point
Ruckinge Grid 33kV
Voltage
33 kV
Date connected
29 Mar 2014
In a connection queue
No
Row last updated by the DNO
13 Nov 2020
Licence area
South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
Address
Old Romney
Postcode
TN29 9SY
Export MPAN
1900091090101

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.

Source