Sycamore Farm
Sycamore Farm, Electricity Solutions Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 18 MW, grid supply point Richborough/Sellindge 132kV.
- Customer
- Electricity Solutions Limited
- Status
- Connected
- Capacity
- 18 MW
- Technology
- Solar (Photovoltaic)
- Flexible connection
- No
- Grid supply point
- Richborough/Sellindge 132kV
- Bulk supply point
- Ruckinge Grid 33kV
- Voltage
- 33 kV
- Date connected
- 29 Mar 2014
- In a connection queue
- No
- Row last updated by the DNO
- 13 Nov 2020
- Licence area
- South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
- Address
- Old Romney
- Postcode
- TN29 9SY
- Export MPAN
- 1900091090101
A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.
Source
- UK Power Networks Embedded Capacity Register (1 MW and over), UK Power Networks, publication of 14 Oct 2026. CC BY 4.0, UK Power Networks.