Swaffham 2 Windpark

Swaffham 2 Windpark, Non Fossil Purchasing Agency, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 1.8 MW, grid supply point Walpole.

Customer
Non Fossil Purchasing Agency
Status
Connected
Capacity
1.8 MW
Technology
Onshore wind (Onshore wind turbines)
Flexible connection
No
Grid supply point
Walpole
Bulk supply point
Swaffham Grid 33kV
Point of connection
Swaffham Grid 11kV
Voltage
11 kV
Date connected
30 Jun 2005
In a connection queue
No
Row last updated by the DNO
14 Dec 2020
Licence area
EPN
Address
Swaffham
Postcode
PE37 7
Export MPAN
1023540992664

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.