Stoneness Road

Stoneness Road, Industrial Chemicals Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 17 MW, grid supply point West Thurrock.

Customer
Industrial Chemicals Limited
Status
Connected
Capacity
17 MW
Maximum import capacity
0 MW
Technology
Gas (Gas turbine (OCGT))
Flexible connection
No
Grid supply point
West Thurrock
Voltage
33 kV
Date connected
5 Jun 2018
In a connection queue
No
Row last updated by the DNO
13 Nov 2020
Licence area
EPN
Address
West Thurrock
Postcode
RM20 3AG
Export MPAN
1050001431630

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.