West Thurrock grid supply point
2 connections of 1 MW and over at West Thurrock in UK Power Networks's register of 14 Oct 2026: 0 MW accepted to connect and 21.5 MW connected. Each row's own figure, added across rows; contracted volume, not headroom.
| Site | Customer | Technology | MW | Status | Target energisation |
|---|---|---|---|---|---|
| Stoneness Road | Industrial Chemicals Limited | Gas | 17 | Connected | |
| Ockendon B Landfill | Viridor Waste Management Limited | Bioenergy | 4.45 | Connected |
Source
- UK Power Networks Embedded Capacity Register (1 MW and over), UK Power Networks, publication of 14 Oct 2026. CC BY 4.0, UK Power Networks.