Stevensons Farm

Stevensons Farm, Foresight Group LLP, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 5 MW, grid supply point Rayleigh.

Customer
Foresight Group LLP
Status
Connected
Capacity
5 MW
Maximum import capacity
5 MW
Technology
Storage (Storage - Electrochemical (Batteries))
Flexible connection
No
Grid supply point
Rayleigh
Bulk supply point
Nevendon Grid 33kV
Voltage
33 kV
Date connected
25 Sept 2024
In a connection queue
No
Row last updated by the DNO
14 Apr 2025
Licence area
EPN
Address
Arterial Road, Basildon
Postcode
SS14 3JH
Export MPAN
1050001507458

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.