Southfleet Hook Green, EcoDev (South) Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 300 MW, grid supply point Littlebrook 132kV (SPN).

Customer
EcoDev (South) Limited
Status
Accepted to connect
Capacity
300 MW
Technology
Storage (Storage - Electrochemical (Batteries))
Flexible connection
Yes (capacity not firm)
Grid supply point
Littlebrook 132kV (SPN)
Voltage
132 kV
Date accepted
8 Oct 2021
Target energisation
31 Dec 2027
In a connection queue
Yes
Row last updated by the DNO
14 Jun 2024
Licence area
South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
Address
Park Corner Road, Gravesend
Postcode
DA13 9LJ

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.