4 connections of 1 MW and over at Littlebrook 132kV (SPN) in UK Power Networks's register of 14 Oct 2026: 300 MW accepted to connect and 17.5 MW connected. Each row's own figure, added across rows; contracted volume, not headroom.
| Site | Customer | Technology | MW | Status | Target energisation |
|---|---|---|---|---|---|
| Southfleet Hook Green | EcoDev (South) Limited | Storage | 300 | Accepted to connect | 31 Dec 2027 |
| Littlebrook Substation | Hazel Capital | Storage | 8 | Connected | |
| Segas House | Scotia Gas Networks Limited | Gas | 7.5 | Connected | |
| Longreach | Thames Water Utilities Limited | Bioenergy | 2 | Connected |
Source
- UK Power Networks Embedded Capacity Register (1 MW and over), UK Power Networks, publication of 14 Oct 2026. CC BY 4.0, UK Power Networks.