Grid GuardianOpen the evidence in the app

Somerton Wind Generator

Somerton Wind Generator, Non Fossil Purchasing Agency Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 2.8 MW, grid supply point Norwich.

Customer
Non Fossil Purchasing Agency Limited
Status
Connected
Capacity
2.8 MW
Technology
Onshore wind (Onshore wind turbines)
Flexible connection
No
Grid supply point
Norwich
Bulk supply point
GT Yarmouth Grid 33kV
Point of connection
Martham Primary 11kV
Voltage
11 kV
Date connected
23 Jun 2000
In a connection queue
No
Row last updated by the DNO
14 Dec 2020
Licence area
EPN
Address
Dereham
Postcode
NR29 4DU
Export MPAN
1023498040392

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.

Source