Smeaton Close

Smeaton Close, AMP Energy Services, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 4 MW, grid supply point Sundon.

Customer
AMP Energy Services
Status
Connected
Capacity
4 MW
Maximum import capacity
0.07 MW
Technology
Gas (Gas turbine (OCGT))
Flexible connection
No
Grid supply point
Sundon
Bulk supply point
Aylesbury East Grid 33kV
Point of connection
Buckingham Rd Primary 11kV
Voltage
11 kV
Date connected
7 Jun 2021
In a connection queue
No
Row last updated by the DNO
14 Jul 2021
Licence area
EPN
Address
Aylesbury
Postcode
HP19 8UW
Export MPAN
1050002116379
Import MPAN
1050002116360

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.