Sheringham Shoal Offshore Windfarm

Sheringham Shoal Offshore Windfarm, National Grid Electricity Transmission PLC, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 322 MW, grid supply point Norwich.

Customer
National Grid Electricity Transmission PLC
Status
Connected
Capacity
322 MW
Technology
Offshore wind (Offshore wind turbines)
Flexible connection
No
Grid supply point
Norwich
Voltage
132 kV
Date connected
1 Apr 2012
In a connection queue
No
Row last updated by the DNO
14 Dec 2021
Licence area
EPN
Address
Sherringham
Postcode
NR10 4BF
Export MPAN
1099000001669

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.