Scottow Road, AD Plant
Scottow Road, AD Plant, Matrix Networks Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 2.8 MW, grid supply point Norwich.
- Customer
- Matrix Networks Limited
- Status
- Connected
- Capacity
- 2.8 MW
- Technology
- Bioenergy (Steam turbine (thermal power plant))
- Flexible connection
- No
- Grid supply point
- Norwich
- Bulk supply point
- Thorpe Grid 33kV
- Point of connection
- Scottow Primary 11kV
- Voltage
- 11 kV
- Date connected
- 1 Jan 2014
- In a connection queue
- No
- Row last updated by the DNO
- 16 Jun 2022
- Licence area
- EPN
- Address
- Norwich
- Postcode
- NR10 5DP
- Export MPAN
- 1050000496725
A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.
Source
- UK Power Networks Embedded Capacity Register (1 MW and over), UK Power Networks, publication of 14 Oct 2026. CC BY 4.0, UK Power Networks.