Grid GuardianOpen the evidence in the app

Rose and Crown Farm

Rose and Crown Farm, DNO Consulting Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 23 MW, grid supply point Walpole.

Customer
DNO Consulting Limited
Status
Connected
Capacity
23 MW
Technology
Solar (Photovoltaic)
Flexible connection
No
Grid supply point
Walpole
Bulk supply point
Walsoken Grid 33kV
Voltage
33 kV
Date connected
16 Mar 2016
In a connection queue
No
Row last updated by the DNO
13 Nov 2020
Licence area
EPN
Address
Nr Ingleborough, Wisbech
Postcode
PE14 7JB
Export MPAN
1050001041935

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.

Source