Redhill Landfill Site 3

Redhill Landfill Site 3, Biffa Waste Services, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 3.2 MW, grid supply point Bolney.

Customer
Biffa Waste Services
Status
Connected
Capacity
3.2 MW
Technology
Bioenergy (Gas turbine (OCGT))
Flexible connection
No
Grid supply point
Bolney
Bulk supply point
Leigh Grid 33kV
Point of connection
Nutfield 11kV
Voltage
11 kV
Date connected
12 Nov 2006
In a connection queue
No
Row last updated by the DNO
18 Apr 2023
Licence area
South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
Address
Cormongers Lane, Redhill
Postcode
RH1 4ER
Export MPAN
1900070732943
Import MPAN
1900070732934

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.