Ramsey Wind Turbine

Ramsey Wind Turbine, REG Ramsey Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 2 MW, grid supply point Eaton Socon.

Customer
REG Ramsey Limited
Status
Connected
Capacity
2 MW
Maximum import capacity
0.05 MW
Technology
Onshore wind (Onshore wind turbines)
Flexible connection
No
Grid supply point
Eaton Socon
Bulk supply point
Huntingdon Grid 33kV
Point of connection
Bury Primary 11kV
Voltage
11 kV
Date connected
28 Aug 2008
In a connection queue
No
Row last updated by the DNO
14 Dec 2020
Licence area
EPN
Address
Huntingdon
Postcode
PE26 2SL
Export MPAN
1030056990789

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.