Grid GuardianOpen the evidence in the app

Rainham Landfill

Rainham Landfill, Non Fossil Purchasing Agency, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 23.22 MW, grid supply point Warley.

Customer
Non Fossil Purchasing Agency
Status
Connected
Capacity
23.22 MW
Maximum import capacity
0.3 MW
Technology
Bioenergy (Engine (combustion / reciprocating))
Flexible connection
No
Grid supply point
Warley
Bulk supply point
Purfleet Grid 33kV
Voltage
33 kV
Date connected
24 Jan 2001
In a connection queue
No
Row last updated by the DNO
14 Nov 2024
Licence area
EPN
Address
Rainham
Postcode
RM13 9DA
Export MPAN
1023525149808

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.

Source