Pladis Harlesden Chp

Pladis Harlesden Chp, Shenton Group, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 1.86 MW, grid supply point Willesden 132kV.

Customer
Shenton Group
Status
Connected
Capacity
1.86 MW
Maximum import capacity
0.01 MW
Technology
Gas (Engine (combustion / reciprocating))
Flexible connection
No
Grid supply point
Willesden 132kV
Point of connection
Gibbons Rd 11kV
Voltage
0.4 kV
Date connected
5 Oct 2023
In a connection queue
No
Row last updated by the DNO
15 Jan 2024
Licence area
London Power Networks plc
Address
Waxlow Road, Harlesden
Postcode
NW10 7NY

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.

Source