Nevendon Battery Park

Nevendon Battery Park, Aura Power Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 10 MW, grid supply point Rayleigh.

Customer
Aura Power Limited
Status
Connected
Capacity
10 MW
Maximum import capacity
10 MW
Technology
Storage (Storage - Electrochemical (Batteries))
Flexible connection
No
Grid supply point
Rayleigh
Bulk supply point
Nevendon Grid 33kV
Voltage
33 kV
Date connected
26 Mar 2018
In a connection queue
No
Row last updated by the DNO
13 Nov 2020
Licence area
EPN
Address
Arterial Road, Basildon
Postcode
SS14 3JH
Export MPAN
1050001507458

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.

Source